•  Bond Basics Projects

    hammer Bond basics are the minor capital improvement projects funded by the bond measure. The majority of these projects are scheduled to be completed during the first three years of bond work. Safety improvements are not included in the bond basics category, information regarding those projects can be found here.
     
    The schedule for parking lot improvements including crack sealing and asphalt slurry, as well as irrigation improvements, is still under development. 
     
    Please note that the schedule below may change depending upon several factors, including calendar, staff availability, material availability, inclement weather, budget and more. This page will be updated to reflect any changes that must be made.  
     
    Year One (2015):
    Douglas Gardens Elementary                                                                                                                               
    ADA improvements and siding replacement        
    Guy Lee Elementary
    Replace the current, above-ground electrical service with an underground service and replace the original hallway lighting with brighter, energy efficient lighting
     
    Page Elementary  
    ADA improvements and expand the parking lot to increase student safety by creating separate parent drop-off and bus loading zones
     
    Walterville Elementary
    Pave the parking lot to increase safety
     
    Yolanda Elementary
    ADA improvements
     
    Briggs Middle
    ADA improvements
     
    Springfield High
    Replace the worn library carpet
     
    Thurston High
    Complete the gymnasium siding replacement project, make improvements to fencing and concrete, and install the additional bleacher seating and cover
     
    42nd Street WarehouseInstall fire sprinkler system as required 
     
     
    Year Two (2016):
     
    Centennial Elementary
    ADA improvements
     
    Guy Lee Elementary
    Boiler replacement
     
    Mt. Vernon Elementary                                                                                               
    Siding and carpet replacement 
    Ridgeview Elementary                                  
    Replace storm water piping to reduce flooding and improve safety
     
    Riverbend Elementary
    Siding and carpet replacement
     
    Walterville Elementary
    Renovate the front entrance to increase student and staff safety
     
    Briggs Middle
    Upgrade the HVAC (Heating, Ventilating, Air Conditioning) system
     
    Thurston Middle
    Repair gym floor structural supports, replace the gym floor and renovate the front entrance to increase student and staff safety
     
    Thurston HighBoiler replacement
     
     
    Year Three (2017): 
     
    Administration Building
    ADA improvements
     
    Thurston Elementary
    Increase parking
     
    Walterville Elementary
    ADA improvements
     
    Yolanda Elementary                                                                    
    Replace interior accordion walls to improve the learning environment and increase student safety
     
    Agnes Stewart Middle 
    Replace exterior flashing to protect against dry rot and structural damage
     
    Thurston Middle
    Install sidewalks to keep students out of the traffic lanes
     
    Springfield High
    Install card locks and readers and make ADA improvements
     
    Thurston HighInstall card locks and readers