 Bond Basics Projects

hammer Bond basics are the minor capital improvement projects funded by the bond measure. The majority of these projects are scheduled to be completed during the first three years of bond work. Safety improvements are not included in the bond basics category, information regarding those projects can be found here.
 
The schedule for parking lot improvements including crack sealing and asphalt slurry, as well as irrigation improvements, is still under development. 
 
Please note that the schedule below may change depending upon several factors, including calendar, staff availability, material availability, inclement weather, budget and more. This page will be updated to reflect any changes that must be made.  
 
Year One (2015):
Douglas Gardens Elementary                                                                                                                               
ADA improvements and siding replacement        
Guy Lee Elementary
Replace the current, above-ground electrical service with an underground service and replace the original hallway lighting with brighter, energy efficient lighting
 
Page Elementary  
ADA improvements and expand the parking lot to increase student safety by creating separate parent drop-off and bus loading zones
 
Walterville Elementary
Pave the parking lot to increase safety
 
Yolanda Elementary
ADA improvements
 
Briggs Middle
ADA improvements
 
Springfield High
Replace the worn library carpet
 
Thurston High
Complete the gymnasium siding replacement project, make improvements to fencing and concrete, and install the additional bleacher seating and cover
 
42nd Street WarehouseInstall fire sprinkler system as required 
 
 
Year Two (2016):
 
Centennial Elementary
ADA improvements
 
Guy Lee Elementary
Boiler replacement
 
Mt. Vernon Elementary                                                                                               
Siding and carpet replacement 
Ridgeview Elementary                                  
Replace storm water piping to reduce flooding and improve safety
 
Riverbend Elementary
Siding and carpet replacement
 
Walterville Elementary
Renovate the front entrance to increase student and staff safety
 
Briggs Middle
Upgrade the HVAC (Heating, Ventilating, Air Conditioning) system
 
Thurston Middle
Repair gym floor structural supports, replace the gym floor and renovate the front entrance to increase student and staff safety
 
Thurston HighBoiler replacement
 
 
Year Three (2017): 
 
Administration Building
ADA improvements
 
Thurston Elementary
Increase parking
 
Walterville Elementary
ADA improvements
 
Yolanda Elementary                                                                    
Replace interior accordion walls to improve the learning environment and increase student safety
 
Agnes Stewart Middle 
Replace exterior flashing to protect against dry rot and structural damage
 
Thurston Middle
Install sidewalks to keep students out of the traffic lanes
 
Springfield High
Install card locks and readers and make ADA improvements
 
Thurston HighInstall card locks and readers
 